The SIV project - future work
There is still a lot to do...
-
Calibrate video cameras to get magnitude of moving object
-
Improve capabilities of automatic meteor detection software (e.g.
Sirko Molau's MetRec)
-
Digitize Perseid 1997 data (15 % done)
-
Relate visual magnitude to radar echo strength, taking into account the
angle between meteor and radar beam
-
Find out whether radiant determination is accurate enough to derive info
on ejection process on comet (cooperation with Laurent Jorda, MPAE)
previous
- next
Back to the homepage of
the
SIV Project.
This page is part of the
SIV project pages. It was created on 19 Jan 1998 by Detlef
Koschny. Last update 05 Nov 1998.